UKAEA-STEP-PR(24)112024
The Spherical Tokamak for Energy Production (STEP) programme is a world-leading fusion power plant programme that has embedded a cost conscience in its design from the early phases. This firmly addresses the attitude of cost complacency of which many major infrastructure projects have historically been accused. While detailed an…
-
UKAEA-STEP-PR(24)022024
Being a novel technology, estimating costs for fusion power plants comes with large uncertainties. Cost uncertainties in prototypes arise from various sources and reduce with programme maturity (including the selection of a site), technical and design maturity, maturity of the commercial strategy (e.g., make vs. buy decisions, partnering de…
-
UKAEA-STEP-PR(23)132023
Developments in fusion energy technology and the aspiration to build and run commercial fusion energy power plants has seen the commencement of numerous publicly and privately funded projects in recent years. Megaprojects, like fusion power plants, by their very nature are inherently complex and risky, therefore providing a robust cost estimate in …
-
UKAEA-STEP-CP(22)012022
With the ITER project entering the second half of the construction phase and various national and international plans for fusion prototype power plants being in early to advanced stages, fusion has entered the delivery era. With the urgency of the climate crisis being at the forefront of government policy agendas it is important to focus on the com…
-
UKAEA-CCFE-PR(21)312021
This paper is part of a series of publications concerning the development of the European DEMO during the pre- conceptual design phase (2014-2020). In particular, it deals with the physics basis employed for the definition of the various DEMO baselines released, and …
-
UKAEA-CCFE-PR(20)892020
With a lack of plasma disruptions and current-driven instabilities, stellarators are potentially an attractive option for a fusion power plant. Previous system studies have been performed to optimise a HELIAS (HELIcal-axis Advanced Stellarator) 5-B power plant using PROCESS, however these have been based around a single design point. In reality …
-
UKAEA-CCFE-CP(20)1042018
During the pre-conceptual design phase of fusion devices such as the European demonstration fusion power plant (DEMO), systems codes provide a fast evaluation of optimal design points and highlight high impact areas. However, determining or evaluating a design point at such an early stage comes with uncertainties in many of the design parameters. T…
-
UKAEA-CCFE-CP(20)792018
The Chinese Fusion Engineering Test Reactor (CFETR) bridges the gap between ITER and a demonstration fusion power plant (DEMO). The primary objectives of CFETR are: demonstrate tritium self-sufficiency, ~1GW fusion power, operate in steady-state and have a duty cycle of 0.3-0.5 [1]. CFETR is in the pre-conceptual design phase and is currently envis…
-
UKAEA-CCFE-CP(19)372020
As conceptual design options for a demonstration fusion power plant (DEMO) are explored it is important to understand the design space for possible non-ITER like design options. The power exhaust is a key design driver for a fusion power plant, and puts strong constraints on the size of the machine. One candidate for a alternative design is a doubl…
-
UKAEA-CCFE-CP(19)452019
Spherical Tokamaks offer a number of potential advantages for a future fusion power plant. They have a high ratio of thermal to magnetic field pressure (beta) and strong flows, either of which could result in reduced turbulence. Fewer Toroidal Field (TF) coils and a different geometry offers the potential for new methods of remote maintenance …
Showing 1 - 10 of 15 UKAEA Paper Results