-
2013
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within the cell, when containment is breached, or the radiological protection is removed the maintenance must be conducted remotely. This maintenance constitutes the removal and…
-
2012
An in-vessel calibration light source (ICLS) has been implemented for remote use during extended shutdown periods of the Joint European Torus (JET). The ICLS facilitated the in situ calibration of optical diagnostics, which previously were performed when the diagnostics were removed from JET. Since the ICLS is used to calibrate diagnostics over the…
Showing 1 - 2 of 2 UKAEA Paper Results
Page 1 of 1