The Chinese Fusion Engineering Test Reactor (CFETR) bridges the gap between ITER and a demonstration fusion power plant (DEMO). The primary objectives of CFETR are: demonstrate tritium self-sufficiency, ~1GW fusion power, operate in steady-state and have a duty cycle of 0.3-0.5 [1]. CFETR is in the pre-conceptual design phase and is currently envis…