Showing 1 - 2 of 2 UKAEA Paper Results
2015
CCFE-PR(17)38
B. Chuilon S. Mistry R. Andrews R. Verhoeven Y. Xue
The Duct Liner (DL) for the ITER Heating Neutral Beam (HNB) is a key component in the beam transport system. Duct Liners installed into equatorial ports 4 and 5 of the Vacuum Vessel (VV) will protect the port extension from power deposition due to re-ionisation and direct interception of the HNB. Furthermore, the DL contributes towards the shieldin…
Preprint Published2015
CCFE-PR(17)26
F. Dhalla S. Mistry I. Turner T.R. Barrett I. Day R. McAdams
For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is b…
Preprint Published