-
UKAEA-CCFE-CP(21)012020
DEMO is a key part of the EU fusion roadmap, and the programme reaches the end of the pre-conceptual phase with a gate review in 2020. As part of the work to complete this phase, eight Key Design Integration Issues (KDII’s) have been identified as critical to the programme. Two of these KDII’s identified a requirement for a more detailed archit…
-
UKAEA-CCFE-CP(20)1182020
A study into the viability of a double null concept for DEMO has been undertaken as part of the work to address Key Design Integration Issues (KDIIs) within the DEMO powerplant. The objective of this study was to evaluate the feasibility of a double null architecture, featuring split blanket segments to enable a wider range of maintenance options…
Showing 1 - 2 of 2 UKAEA Paper Results
Page 1 of 1