A set of Be and W tiles removed after the first ITER-like Wall campaigns (JET-ILW) from 2011-2012 has been analysed. The results indicate that the primary erosion site is in the main chamber (Be) as in previous carbon campaigns (JET-C). In particular the limiters tiles near the mid-plane are eroded probably during the limiter phases of discharges. …
Selected Ion Beam Analysis techniques applicable for detecting deuterium and heavier impurities have been used in the post-mortem analyses of tiles removed after the first JET ITER-Like Wall (JET-ILW) campaign. Over half of the retained fuel was measured in the divertor region. The highest figures for fuel retention were obtained from regions with …