Showing 1 - 2 of 2 UKAEA Paper Results
2015
CCFE-PR(17)31
Z. Vizvary D. Iglesias D. Cooper R. Crowe V. Riccardo
The blanket attachment has to cope with gravity, thermal and electromagnetic loads, also it has to be installed and serviced by remote handling. Pre-stressed components suffer from stress relaxation in irradiated environments such as DEMO. To circumvent this problem pre-stressed component should be either avoided or shielded, and where possible key…
Preprint Published2013
N Sykes C Belcher C-H Choi O Crofts R Crowe C Damiani S Delavalle L Meredith T Mindham J Raimbach A Tesini M Van Uffelen
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within the cell, when containment is breached, or the radiological protection is removed the maintenance must be conducted remotely. This maintenance constitutes the removal and…
Published