Multi-machine validation of full electromagnetic plasma initiation modelling with DYON was carried out by the joint modelling of the International Tokamak Physics Activity (ITPA) – Integrating Operating Scenario (IOS) group. The following devices were included in the experiment database: VEST (spherical torus, copper coils, Stainless steel wa…
Precipitation hardened Copper-Chromium-Zirconium (CuCrZr) alloy is a prime
candidate for divertor components in future European DEMOnstration fusion reactors. To develop the DEMO Design Criteria for In-vessel Components (DDC-IC), the failure criterion of CuCrZr needs to be investigated. Hence, the effects of stress triaxiality and loading…